1026 results found
Featured results
More results
Digital Design-Built Policies are coherent plans for digital infrastructure delivery which align with recognised industry standards and frameworks. They seek to digitise the asset lifecycle by requiring the use of specific digital technologies in the design and construction process.
Preparations for the London 2012 Olympics involved 137 projects each in separate contracts of varying scale, from major works including the 80,000-seat Olympic stadium, through to preparation works at small-scale competition spaces. The program was delivered amid a local environment of heavy government, media, regulatory, and public scrutiny that demanded the program be delivered on-time with positive health and safety, quality, and environmental and sustainability outcomes .
The Seoul Metropolitan Government (SMG) undertakes infrastructure projects within the city covering assets such as roads, tunnels, and subway lines. Design and planning are performed by departments within SMG while the actual construction work is the responsibility of the Seoul Metropolitan Infrastructure Headquarters (SMIH).